000 00704cam a2200217 a 4500
999 _c1212
_d1212
020 _a0471291676 (cloth : alk. paper)
050 0 0 _aTS157.5
_b.C67 1999
100 1 _aCorrell, James G.
245 1 0 _aGaining control :
_bcapacity management and scheduling /
_cJames G. Correll, Norris W. Edson.
250 _a2nd ed.
260 _aNew York :
_bJohn Wiley,
_cc1999.
300 _axiv, 2708p. :
_bill. ;
_c24 cm.
440 0 _aOliver Wight manufacturing series
500 _aIncludes index
650 0 _aProduction scheduling.
650 0 _aManufacturing resource planning.
650 0 _aJust-in-time systems.
650 0 _aIndustrial capacity
_xManagement.
700 1 _aEdson, Norris W.
942 _cBK