| 000 | 00704cam a2200217 a 4500 | ||
|---|---|---|---|
| 999 |
_c1212 _d1212 |
||
| 020 | _a0471291676 (cloth : alk. paper) | ||
| 050 | 0 | 0 |
_aTS157.5 _b.C67 1999 |
| 100 | 1 | _aCorrell, James G. | |
| 245 | 1 | 0 |
_aGaining control : _bcapacity management and scheduling / _cJames G. Correll, Norris W. Edson. |
| 250 | _a2nd ed. | ||
| 260 |
_aNew York : _bJohn Wiley, _cc1999. |
||
| 300 |
_axiv, 2708p. : _bill. ; _c24 cm. |
||
| 440 | 0 | _aOliver Wight manufacturing series | |
| 500 | _aIncludes index | ||
| 650 | 0 | _aProduction scheduling. | |
| 650 | 0 | _aManufacturing resource planning. | |
| 650 | 0 | _aJust-in-time systems. | |
| 650 | 0 |
_aIndustrial capacity _xManagement. |
|
| 700 | 1 | _aEdson, Norris W. | |
| 942 | _cBK | ||