Product design and development / Karl T. Ulrich, Steven D. Eppinger.
Material type:
TextPublication details: Boston : Irwin/McGraw-Hill, 2000.Edition: 2nd edDescription: xxvi, 358 p. : ill. ; 25 cmISBN: - 007229647X
- HD31 .U47
| Cover image | Item type | Current library | Home library | Collection | Shelving location | Call number | Materials specified | Vol info | URL | Copy number | Status | Notes | Date due | Barcode | Item holds | Item hold queue priority | Course reserves | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Books
|
Methodist University Library Main General Stacks | Reference | HD31 .U47 (Browse shelf(Opens below)) | Available | 12670 | |||||||||||||
Books
|
Methodist University Library Main General Stacks | Reference | HD31 .U47 (Browse shelf(Opens below)) | Available | 12671 | |||||||||||||
Books
|
Methodist University Library Main General Stacks | HD31 .U47 (Browse shelf(Opens below)) | Available | 12673 |
1. Introduction --
2. Development Processes and Organizations --
3. Product Planning --
4. Identifying Customer Needs --
5. Product Specifications --
Appendix. Target Costing --
6. Concept Generation --
7. Concept Selection --
Appendix A. Concept-Screening Matrix Example --
Appendix B. Concept-Scoring Matrix Example --
8. Concept Testing --
Appendix. Estimating Market Sizes --
9. Product Architecture --
10. Industrial Design --
11. Design for Manufacturing --
Appendix A. Materials Costs --
Appendix B. Component Manufacturing Costs --
Appendix C. Assembly Costs --
Appendix D. Cost Structures --
12. Prototyping --
13. Product Development Economics --
Appendix. Time Value of Money and the Net Present Value Technique.
There are no comments on this title.